|
Index to the Build Pages
- Introduction and content of this build
- Head parts and blade grip assembly
- Blade grip bearing assembly and feathering spindle fitting
- Main blade head assembly and mixer arms
- Mixer arms and main head assembly
- Flybar fitting and washout arms
- Washout arms and swashplate assembly
- Flybar paddle fitting and rotor head control rod assembly
- Fitting the main shaft
- Main gear assembly
- Main gear assembly and undercart assembly
- Main frames assembly part 1
- Main frames assembly part 2
- Main Frames assembly part 3
- Collective rocker assembly part 1
- Collective rocker assembly part 2
- Collective rocker assembly part 3
- Tail gearbox assembly part 1
- Tail gearbox assembly part 2
- Tail rotor assembly part 1
- Tail rotor assembly part 2
- Tail boom and main blade installation
- Motor and tail servo installation
- Servo installation
- Control pushrod installation
- Receiver and ESC installation
- Gyro Installation
|
|